On Tuesday a smaller truss crew made the Ricky trusses and then joined the rest of the crew at Girasoles.
The decking was lifted and placed for the second floor, and walls were constructed!
The electrical team began wiring the first floor,
The stair master and helpers built the stairway
Saul and his crew poured the cement pad to rest it on.
A small crew went to help out at a kitchen in Terrazas del Valle, where a ministry of the Arca de Salvacion church is feeding between 100 and 120 children breakfast before school five days a week. The work crew cleaned and prepped the walls for painting.