Thursday, April 02, 2009

Wednesday, the half-way point

Wednesday the group continued to work on the half-way house.

The walls on the second story were made, covered with stucco (chicken) wire, and raised.
Interior walls are also in place.

The stairs were finished, and nailed in place.

The wiring on the first floor is almost done,
there was some destruction work to be done as well.
At the end of the day, this is how the building looked.
We again had a great meal, great devotions and singing, and Scott was presented with a red flag to keep in his pickup for hauling loads that stick over the tailgate.