Friday, March 14, 2008

Thursday



Thursday was a busy day. The two main projects were the wiring and the roof.


A trench had to be dug from the electrical pole at the road to each of the buildings to lay the main cable. The new santuary as well had to be wired for lights, outlets, fans, and speaker wire.


The roof was another big job. The plywood had to be nailed on, then the tar paper and shingles. Bird block and facia boards had to be cut and nailed up as well. By the end of the day, one side was shingled and some of the plywood was up on the other side.


Everyone returned "home" to Pancho Villa tired. The pingpong table had only a few takers.

No comments: